ABAP Keyword Documentation → ABAP - Release-Specific Changes → Changes in Releases 7.5x → Changes in Release 7.50
ABAP Unit in Release 7.50
Other versions:
7.31 | 7.40 | 7.54
Modification 1
Test Seams and Injections
Test seams and
injections have been introduced
for unit tests in ABAP Unit. When tests are executed, code wrapped in
TEST-SEAM and END-TEST-SEAM
as part of production code can be replaced by code from test classes wrapped by
TEST-INJECTION
and END-TEST-INJECTION
.
Test classes with injections must be created in test includes. With the exception of test includes for class pools and function groups, no test includes can currently be created.